Generator Installations
Professional standby and portable generator installation for homes and businesses. Properly sized, permitted, and wired to keep your power on when the grid goes down.
Site Assessment and Load Calculation
We evaluate your electrical panel, critical circuits, fuel source availability, and installation location to determine the right generator size and placement.
Permitting and Equipment Procurement
We pull electrical and gas permits, order your generator and transfer switch, and coordinate any utility work needed for gas line upgrades.
Installation and Startup
We pour or set the pad, install the generator, wire the transfer switch, connect fuel lines, and commission the system with a full load test.
Inspection and Training
After municipal inspection and approval, we walk you through operation, maintenance schedules, and what to expect during an outage.
How long does a generator installation take?+
Most residential standby generator installations take one to two days once permits are approved and equipment arrives. Commercial projects vary based on size and complexity.
Do I need a permit for a generator in New Jersey?+
Yes. Standby generators require an electrical permit and often a gas permit. We handle all permitting and inspections as part of the installation.
Can I install a generator myself?+
No. NJ law requires licensed electricians to install transfer switches and make electrical connections. Gas connections must be done by licensed plumbers or HVAC techs. DIY installations void warranties and create serious safety hazards.
Get it wired right, the first time.
Tell us what's going on and we'll take a look — honest assessment, upfront pricing, no obligation.
- Free, no-pressure estimate
- Upfront, transparent pricing
- Workmanship warranty